Please help us improve the quality of example sentences! Edit on Github

路基土石方施工采用机械化作业。Subgrade's earthwork construction is carried out by machine.

深圳某土石方开挖工程采用中深孔爆破方式。Deep-hole blasting was used to excavate soil-rock in some project in Shenzhen.

Other words in sentence

某工程的土石方开挖采用大直径深孔爆破方式。Large-diameter long hole blasting was used to excavate soil-rock in some engineering project.

台阶深孔微差爆破是一种大规模、快速的土石方施工方法。Deep-holed millisecond blasting is a fast construction method applied to large scale earthwork.

优化模型可以广泛应用于道路、堤防等工程的土石方调配问题中。The model can be used in earth-rock allocation of road engineering and levee engineering widely.

二清除机具装载之废弃物、剩馀土石方有严重污染之虞。There are concerns of serious pollution from waste or residue soil carried by the clearing machinery.

路基土石方除利用方外,其余均弃于设计指定的弃土场。Except the earthwork that used in Subgrade, the others will be put into the appointed waste bank place.

Other words in sentence

土石方挖填量大,施工过程中发生的水土流失直接进入江河湖海。The projects need a large number of excavations and filling of earth and stonework in the construction.

同时还对大型土石方工程计量过程中的人工干预程度进行了探讨。At the same time, it also discusses the degree of manual intervention in mass calculation for earth work.

土石方工程有海南火山口高尔夫球场、清水湾度假村、文昌航天城基础工程。Hainan crater of earth and stone works golf course, Bay Village, Wenchang space city infrastructure projects.

介绍了利用一种常用的土石方软件系统来计算土石方的技巧。This thesis aims to make use of a frequently used earthwork software system to introduce skills in calculating earthwork.

以部分路段为例,在建模时通过采用不同的插值方法计算出土石方量。Take the part of Liugongdao highway for instance, computed the earthwork volume use different spatial interpolation when building DEM.

Other words in sentence

同时,本系统对道路工程、机场及其他大型土建工程中的土石方调配问题同样适用。The system is available for earth-rock allocation problems in road projects, airport projects and other large-scale civil engineering.

公司专业从事土石方爆破、拆除爆破、水下爆破及爆破技术咨询服务。Company specializing in earth and stone blasting, demolition blasting, underwater blasting and blasting technology consulting services.

本文对面板堆石坝的施工分期、土石方平衡、料场选择和填筑工艺作了阐述,也对施工进度作了说明。Construction stages and progress, equilibrium of earth-rock, selection of quarries as well as filling process is described in the paper.

当土石方运距在700米以上采用挖掘机、装载机配自卸汽车机械化组合施工方式。When transportation distance is beyond 700 m, construct by excavators, loaders and mechanized dump truck portfolio construction methods.

并且分析了水利工程土石方平衡调配特点,最后说明土方平衡调配方法。And analyzes the water conservancy project balanced deployment conditions features, and finally earthwork that balanced deployment method.

Other words in sentence

并以向家坝水电站工程土石方平衡调配规划作为研究背景,对取得的成果进行了具体实践。The fast quantity calculation and balance allocation planning of the earth-rock work become more and more important in project construction.

就路基填筑、填土规划、填筑技术、土石方挖方地段顶面处理,对防止铁路路基贴薄层现象的发生进行了阐述。The paper describes railway bed filling, building technique and soil or rock engineering and prevention of thin sticking layer on railway bed.

就土石坝施工中的土石方调配与坝体施工组织设计优选进行了讨论分析。Two main problems in embankment dam construction, earthwork allocation and construction organization plan, are analyzed firstly in this paper.