Please help us improve the quality of example sentences! Edit on Github

小麦的早熟性为隐性遗传。The character of Earliness in wheat is a recessive inheritance.

当前世界主要产棉地区,都十分重视早熟性。The earliness of cotton has become an important subject interested by people of most cotton rowing countries.

Other words in sentence

针对并行批处理调度过程,以总提前完成时间最小化为目标函数,建立了一个基于交货期的调度模型。For a parallel batch process, a scheduling model based on due dates was built to minimize the total earliness.

早于或晚于交货期窗口的任务都不受欢迎,且将导致提前或拖期惩罚。Early or tardy its due window of the job is highly discouraged, and it will incur earliness or tardiness penalty.

通过第一次收花率、生育期、营养生长期与生殖生长期比较等性状总结了我国短季棉早熟性育种的成效。The problem of earliness with decrepitude has worse effect on the yield in the short-season cotton in our country.

在允许机器空闲的条件下,寻找一个工件排序,使得最大提前完工时间最小。Under the condition of permission the idle insert, a job sequence was determined, which minimize the maximum earliness.

据后来的分析,提前脱离金本位制的国家真实地应验了其经济的复苏。According to later analysis, the earliness with which a country left the gold standard reliably predicted its economic recovery.

Other words in sentence

目标函数是使完工时间,提前完工时间和误工时间的加权和最小。The objective is to determine the optimal due-date and schedule simultaneously to minimize the completion time, earliness and tardiness penalties.

不确定加工时间用区间数来表示,以工件提前或者拖期遭受惩罚的可能性的总加权和最小作为优化目标。Uncertain processing time was represented by interval numbers. The objective was to minimize the weighted sum of penalty possibility for jobs due to earliness or tardiness.

当工件具有共同工期及不同提前隶属水平时,给出了调度为最优的必要条件,并构造了求解该问题的分枝定界算法。In the case that the jobs have a common due-date and the same membership grade of earliness , an optimal scheduling is obtained in which the total completion earliness is maximized.

在工件的加工时间及工期均为模糊参数的情况下,研究了单机调度中的总提前完工量问题。In the fuzzy environment that the processing times and the due-dates of jobs are fuzzy parameters, the total completion earliness problem of single machine scheduling is investigated.

本文对不确定加工时间用区间数来表示,以工件提前或者拖期遭受惩罚的可能性的总加权和最小作为优化目标。In this paper, interval numbers symbolize uncertain process times and the optimum objective is to minimize the weighted sum of penalty possibility for jobs due to earliness or tardiness.