Please help us improve the quality of example sentences! Edit on Github

水电站必须有拦河坝。A water power station must have a dam.

一道拦河坝将会在上游拦住水流,抬升水位。A barrage would halt the flow upstream and lift the water level.

Other words in sentence

河口筑起了拦河坝,后便形成了淡水湖。The mouth of the river is and a freshwater lake created behind the.

河口筑起了拦河坝,坝后便形成了淡水湖。The mouth of the river is dammed and a freshwater lake created behind the dam.

中国青铜峡黄河水利枢纽工程拦河坝合拢截流。The barrage closure works of Qingtongxia Key Water Control Project on Yellow River in China.

文中对拦河坝的筑坝材料、坝体施工和坝基础渗流控制措施做了介绍。The paper introduces the damming materials, the dam construction and the foundation seepage control.

枢纽工程中的拦河坝选定全断面碾压混凝土重力坝,其碾压混凝土掺合料的选择是本工程的筑坝关键问题。The selection of the admixture for its roller compacted concrete is the key to the construction of this project.

Other words in sentence

安装在法国兰斯发电站拦河坝上的涡轮机构成了兰斯河上的漩涡。Turbines at the Barrage de la Rance electric power generating station in France create a whirlpool in the Rance River.

英国提出了一项潮汐能拦河坝工程,该拦河坝将横截在作为英格兰和威尔士分界线的塞汶河河口。In the future, the U. K. has proposed a tidal power barrage across the Severn Estuary that separates England and Wales.

拦河坝由混凝土面板堆石大坝和粘土心墙堆石二坝组成。The water retaining dam consists of rock-fill main dam with concrete face slab and rock-fill second dam with clay core.

加筋土结构在挡土墙中的应用已较为普及,但作为溢流拦河坝的坝体结构目前却较少。The reinforced earth structure is popularized in the earth-retaining wall, but the reinforced earth overflow dam is few.

碾压混凝土拦河坝工程须经过四个枯水期四个汛期的施工才能达到设计高程。The construction of the roller compacted concrete dam needs four dry seasons and four flood seasons to reach the design elevation.

Other words in sentence

向昔日的法老一样,党中央组织和动员了巨资和人力建设了36个大坝,159个小坝,4000个拦河坝。Like latter-day pharaohs, the party mobilized enormous resources and manpower into building 36 big dams, 159 smaller dams and 4,000 locks and barrages.

大黑汀水库拦河坝设计采用多种降低坝基扬压力的对策,提高了大坝安全度。In the design of the dam for Daheiting Reservoir, many countermeasures are adopted to lower the uplift pressure in the foundation for improvement of the dam safety.

以榕江上游乌石坝-三洲拦河坝段水环境容量为例,对容量定义法及解析解两种方法进行了对比研究。Taking WEC of the river between Wushi Dam and Sanzhou Dam in the upstream as an example, two methods, the capacity definition method and analytic solution were compared.

阳明山水电站拦河坝采用C15细石混凝土砌石双曲拱坝,坝顶表孔泄洪,挑流消能。Yangmingsha Hydropower station dam is a C15 small size aggregate concrete stone masonry double curvature arch dam with crest spillway and flip buckets for energy dissipation.