Please help us improve the quality of example sentences! Edit on Github

目前围堰是稳定安全的。The cofferdam is safe and stable.

常规的临时围堰在完工后还需要拆除。A conventional temporary structure is demolished after use.

Other words in sentence

承建的导流明渠和纵向围堰工程。Open Channel and Longitudinal Cofferdam Project Attributed to CGGC.

这是可怕的,看看手中的精益溺爱使围堰严重。It is awful to see the lean hands of dotage making a coffer of the grave.

水坝工程师没有考虑围堰崩溃对下游造成的影响。The dam builders fail to consider the downstream effects of cofferdam failure.

二是临时围堰及后方陆域连接工程。The other part is temporary cofferdam and the rear land-based connection project.

双壁钢围堰是桥梁深水基础施工的重要设施。Double-wall steel cofferdam is the important facility of bridge's deepwater foundation.

Other words in sentence

介绍单壁钢套箱围堰的设计与施工技术。In this paper, the design and construction techniques for the cofferdams are described.

双壁钢围堰是大中型桥梁深水主墩施工的大型临时设施。Taking the bored pile foundation constructed with double-walled steel cofferdam for No.

利用水下控制爆破方法拆除了大源渡河中的混凝土纵向围堰。A longitudinal concrete cofferdam was demolished by way of underwater controlled blasting.

在近代工程中,筑围堰时一般先打下钢板桩以形成阻水层。Cofferdams are made by driving metal sheet piling into the Bed to form a watertight fence.

文章详细介绍了砂袋围堰的施工情况和实施效果。This paper has a detailed description on construction and final results of sand bag cofferdam.

Other words in sentence

围堰完工稳固后,就将围堰间的水抽干。When the cofferdams are completed and made safe, the water trapped between them is pumped out.

介绍钢围堰加工工艺与加工流程。The workmanship and process flow of the manufacturing of the cofferdams are presented herewith.

临时附属工程主要是临时围堰工程和文物防护工程。Temporary projects include temporary cofferdam project and protection project of ancient relics.

本发明涉及一种水电建设中修建的挡水围堰型式。The invention relates to a water-retaining cofferdam mode in water and electricity construction.

旨在为大型斜拉桥建设提供可行的主塔基础钢围堰施测方法。This is aimed at providing an effective measuring method for such kind of cofferdam construction.

Other words in sentence

工人得和时间和天气赛跑,强化围堰使之牢固。The workers have to race against time and weather to shore up the cofferdams and make them secure.

根据施工进度安排,为满足发电及纵向围堰坝身段排漂过流条件,必须于2006年汛前完成拆除工作。In order to keep the pace of construction, the 3rd RCC had to be removed before flood season in 2006.

在混凝土芯完成前,围堰只是一堆直接倒入江中的土石。Until the cement core is built, the cofferdams are made of rubble which is simply dumped into the river.